The flood situation of Dighinala in Khagrachari is still unchanged. The people of 20 villages of Merung Union are still waterlogged. In addition, the water in 5 villages of Kabakhali Union has not yet receded. Apart from this, road communication with Longdu in Rangamati has been stopped in the headquarters area of Dighinala-Longdu road. Merung market has sunk.
The residents of Longadu Upazila are in trouble due to the closure of road communication. Landslides have also occurred at several places on the Khagrachari-Longdu road.
Merung Union Chairman Mahmuda Begum Lucky said that the flood situation has not improved. Still 20 villages from central Boalkhali village to Sobahanpur are waterlogged. We are helping flood victims. If the rain continues, there is a possibility of water rising. Road communication with Langdur is closed due to water rising on the road in the headquarters area of Merung.
Sajek road connection with Khagrachari is still closed. Water is flowing 5 feet above the road in Baghaihat and Machalong areas. 465 tourists are stuck on the road.